BREEAM Indoor pollutants VOCs
Contents |
[edit] Aim and benefits
The aim of this issue is to improve indoor air quality for building occupants through the specification of materials to internal spaces with low VOC content.
VOCs (Volatile Organic Compounds) are substances that have a high vapour pressure at room temperature. In effect, this means they are released in to the air from materials without having to heat them.
VOCs can be human made, or naturally occuring and not all VOCs are harmful to human health. Most smells/odours are VOCs including smells from plants used to communicate. However, many VOCs are harmful to human health, and while typically not imminently toxic in the concentrations likely come across, there is significant evidence that they have a compound effect over time on human health. Issues can range from experiencing sick building syndrome, to increases in chances of leukemia.
VOC concentrations can be up to 1000 times higher indoors than outdoors (although likely five times higher), and with significant time being spent indoors by a large proportion of the population, this presents a problem. The concentrations of VOCs are frequently higher in new build/refurbishments.
By reducing VOC content in materials used in the building, the benefit to occupants of the building is a more pleasant working environment (VOCs smell!), and reduced impact on their health.
[edit] When to consider
It is important for the success of the credit to ensure early engagement is undertaken by the Design Team. The Assessor should ideally get the architect to complete a specification document confirming that the initially specified finishes (i.e. paints, varnishes, wood panels) meet the BREEAM compliance in line with Table 20.
In addition, where "Equal and approved" products are acceptable, the specific standards required by the product should be included in the architectural specification.
The second point at which this credit need be considered is when letting packages to sub contractors. The requirements of the credit need to be clearly stated in the sub contractors tender pack and then contract so that they are fully aware of the products that need to be used. There is frequently (although not always) a small cost uplift in using low VOC products.
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
Awaiting content
[edit] Tools and resources
Awaiting content
[edit] Tips and best practice
Awaiting content
[edit] Typical evidence
Awaiting content
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- List applicable schemes here
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
[edit] Related articles on Designing Buildings Wiki
- Air filtration and clean Indoor air quality standards.
- Air quality.
- At a glance - Indoor air quality.
- BREEAM and air quality.
- BREEAM Indoor air quality plan.
- BREEAM Indoor air quality Ventilation.
- Clean indoor air for healthy living - New air filter standards.
- Ensuring good indoor air quality in buildings.
- GREENGUARD Certification.
- Health effects of indoor air quality on children and young people.
- Indoor air quality.
- Indoor environmental quality.
- Volatile Organic Compounds.
Featured articles and news
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.